job shop production planning
常见例句
- Dynamic planning takes place when a job is released for production to the shop floor.
动态计划出现在车间需要员工生产的时候。 - The necessity and feasibility of the integration of process planning and production scheduling and the relations between CAPP and shop job scheduling are analyzed.
对工艺设计与生产调度集成的必要性和可行性进行了分析,讨论了工艺设计与车间作业计划之间的关系。 - MRP system is not very efficient in production planning and control of job shop, especially of the one that contains three-level structure: shop, subshop and workgroup.
物料需求计划(MRP)系统对于车间层,尤其是基于车间-工段-班组的车间层的作业计划和控制不是很有效的。 返回 job shop production planning