tower belt crane
基本解释
- [能源科学技术]塔带机
- [水利工程]塔带机
英汉例句
- As a result, the study and analysis of the structure of tower belt crane can redound to the design of tower-belt, which has own knowledge property right.
因此,对塔带机的结构进行研究和分析,可以为发具有自主知识产权的布料机提供基础。 - The concrete delivery system for the dam is composed of mixer feeding conveyer, system connecting conveyer, 3 high-speed belt conveyer lines, 3 vacuum-chutes and 2 sets of tower crane placers .
龙滩大坝混凝土供料线系统由拌和楼出料皮带机和系统连接皮带机、3条高速皮带机供料线、3条负压溜槽和2台塔式布料机组成。 - The concrete delivery system for the dam is composed of mixer feeding conveyer, system connecting conveyer, 3 high-speed belt conveyer lines, 3 vacuum-chutes and 2 sets of tower crane placers.
龙滩大坝混凝土运输供料线系统由拌和楼出料皮带机和系统连接皮带机、3条高速皮带机供料线、3条负压溜槽和2台塔式布料机组成。
双语例句
专业释义
- 塔带机
- 塔带机