batch job scheduling
基本解释
- [計算機科學技術]批量任務調度
英汉例句
- The objective of this paper is to minimize the delivery time and the batch scheduling problems with job processing times are the same.
本文主要研究極小化工件配送時間及工件加工時間相同時的分批配送問題。 - Again, when scheduling non-sequential batch jobs, they can all be scheduled at 23:00 because they will be queued one at a time though the job spooler.
同樣,在調度不連續的批作業時,可以把它們都安排在 23:00,因爲它們會通過假脫機程序每次運行一個。 - In batch scheduling problems, B jobs can be processed on the machine at most, and they are not allowed to be interrupted, removed, or added a new job during processing.
在分批排序問題中,機器一次最多可加工B個工件,工件在加工過程中不允許被打斷、移出或加入新工件;
雙語例句
专业释义
- 批量任務調度